Basic Work and Time Calculation – Type 1
$\textbf{Type 1: Basic Work and Time Calculation}$
$\textbf{Concept Explanation:}$ This type involves calculating the time taken by one or more people or machines to complete a task based on their work rates. The work rate is defined as the amount of work done per unit of time.
$\textbf{Formulae:}$
$\textbf{1. Work Rate:}$ If a person or machine can complete a task in $T$ hours, their work rate is $\frac{1}{T}$ of the task per hour.
$\textbf{2. Total Work:}$ Total work is generally considered to be 1 unit (the complete task).
Combined Work Rates – Type 2
$\textbf{Type 2: Combined Work Rates}$
$\textbf{Concept Explanation:}$ When two or more people or machines work together, their combined work rate is the sum of their individual work rates. This type requires calculating how long it will take to complete a task when multiple agents are working simultaneously.
$\textbf{Formulae:}$
$\textbf{1. Combined Work Rate:}$ If person A can complete a task in $T_A$ hours and person B can complete the same task in $T_B$ hours, their combined work rate is:
$$
\text{Combined Work Rate} = \frac{1}{T_A} + \frac{1}{T_B}
$$
$\textbf{2. Time to Complete Task Together:}$ The time taken to complete the task together is:
$$
\text{Time} = \frac{1}{\text{Combined Work Rate}}
$$
Solved Problem – Type 2
$\textbf{Example Problem:}$ Alice can mow a lawn in 4 hours, and Bob can mow the same lawn in 6 hours. How long will it take for them to mow the lawn together?
$\textbf{Step-by-Step Solution:}$
$\textbf{1. Calculate individual work rates:}$
Alice’s work rate = $\frac{1}{4}$ of the lawn per hour
Bob’s work rate = $\frac{1}{6}$ of the lawn per hour
$\textbf{2. Determine their combined work rate:}$
$$ \text{Combined Work Rate} = \frac{1}{T_A} + \frac{1}{T_B} = \frac{1}{4} + \frac{1}{6} = \frac{3}{12} + \frac{2}{12} = \frac{5}{12} $$
So, their combined work rate is $\frac{5}{12}$ of the lawn per hour.
$\textbf{3. Calculate the time taken to complete the work together:}$
$$ \text{Time} = \frac{1}{\text{Combined Work Rate}} = \frac{1}{\frac{5}{12}} = \frac{12}{5} = 2.4 \text{ hours} $$
$\textbf{4. Conclusion:}$ It will take Alice and Bob 2.4 hours to mow the lawn together.
Solved Problem – Type 3
$\textbf{Example Problem:}$ Alice can mow a lawn in 4 hours, and Bob can mow the same lawn in 6 hours. How long will it take for them to mow the lawn together?
$\textbf{Step-by-Step Solution:}$
$\textbf{1. Calculate individual work rates:}$
ย ย ย Alice’s work rate = $\frac{1}{4}$ of the lawn per hour
ย ย ย Bob’s work rate = $\frac{1}{6}$ of the lawn per hour
$\textbf{2. Determine their combined work rate:}$
$$ \text{Combined Work Rate} = \frac{1}{T_A} + \frac{1}{T_B} = \frac{1}{4} + \frac{1}{6} = \frac{3}{12} + \frac{2}{12} = \frac{5}{12} $$
So, their combined work rate is $\frac{5}{12}$ of the lawn per hour.
$\textbf{3. Calculate the time taken to complete the work together:}$
$$ \text{Time} = \frac{1}{\text{Combined Work Rate}} = \frac{1}{\frac{5}{12}} = \frac{12}{5} = 2.4 \text{ hours} $$
$\textbf{4. Conclusion:}$ It will take Alice and Bob 2.4 hours to mow the lawn together.
$$ 0.4 \times 60 = 24 \ \text{Min} $$
Inverse Work Problems – Type 4
$\textbf{Type 4: Inverse Work Problems}$
$\textbf{Concept Explanation:}$ In these problems, the time required for a person to complete a task is inversely proportional to their efficiency. The more efficient a person is, the less time they take to complete a task.
$\textbf{Formulae:}$
$\textbf{1. Efficiency:}$ Efficiency is the reciprocal of the time taken to complete a task. If a person A takes $T_A$ hours to complete a task, their efficiency is $\frac{1}{T_A}$.
$\textbf{2. Inverse Time Relationship:}$ If efficiency increases, time decreases and vice versa, maintaining the product Efficiency $\times$ Time $=$ constant.
Solved Problem – Type 4
$ \textbf{Example Problem:} $ If David is twice as efficient as Edward and Edward can complete a task in 12 hours, how long will it take David to complete the same task?
$ \textbf{Step-by-Step Solution:} $
$ \textbf{1. Calculate Edward’s efficiency:} $
$$
\text{Edward’s efficiency} = \frac{1}{12}
$$
$ \textbf{2. Determine David’s efficiency:} $
Since David is twice as efficient as Edward:
$$
\text{David’s Efficiency} = 2 \times \text{Edward’s Efficiency} = 2 \times \frac{1}{12} = \frac{2}{12} = \frac{1}{6}
$$
$ \textbf{3. Calculate the time taken by David:} $
$$
\text{Time taken by David} = \frac{1}{\text{David’s efficiency}} = \frac{1}{\frac{1}{6}} = 6 \text{ hours}
$$
$ \textbf{4. Conclusion:} $ David will take 6 hours to complete the task.
Work with Multiple Agents Having Different Efficiencies – Type 5
$ \textbf{Concept Explanation:} $ This type involves calculating the time taken to complete a task when multiple agents, each with different efficiencies, are working together. The key is to use the concept of efficiency and total work to find the required time.
$ \textbf{Formulae:} $
$ \textbf{1. Efficiency of Agent:} $ If an agent A can complete a task in $ T_A $ hours, the efficiency of A is $ \frac{1}{T_A} $.
$ \textbf{2. Total Work:} $ Total work is often considered as 1 complete task.
$ \textbf{3. Combined Work Rate:} $ If agents A, B, and C have efficiencies $ E_A $, $ E_B $, and $ E_C $, respectively, their combined work rate is:
$$
\text{Combined Work Rate} = E_A + E_B + E_C
$$
$ \textbf{4. Time to Complete the Task:} $
$$
\text{Time} = \frac{1}{\text{Combined Work Rate}}
$$
Solved Problem – Type 5
$ \textbf{Example Problem:} $ Three workers, Alex, Ben, and Chris, can complete a task in 5 hours, 10 hours, and 15 hours, respectively. How long will it take them to complete the task if they all work together?
$ \textbf{Step-by-Step Solution:} $
$ \textbf{1. Calculate individual efficiencies:} $
$$
\text{Efficiency of Alex} = \frac{1}{5} \text{ of the task per hour}
$$
$$
\text{Efficiency of Ben} = \frac{1}{10} \text{ of the task per hour}
$$
$$
\text{Efficiency of Chris} = \frac{1}{15} \text{ of the task per hour}
$$
$ \textbf{2. Determine the combined work rate:} $
$$
\text{Combined Work Rate} = E_A + E_B + E_C = \frac{1}{5} + \frac{1}{10} + \frac{1}{15}
$$
To add these fractions, find the least common multiple (LCM) of the denominators:
$$
\text{LCM of } 5, 10, \text{ and } 15 = 30
$$
$$
\text{Combined Work Rate} = \frac{6}{30} + \frac{3}{30} + \frac{2}{30} = \frac{11}{30}
$$
$ \textbf{3. Calculate the time to complete the task:} $
$$
\text{Time} = \frac{1}{\text{Combined Work Rate}} = \frac{1}{\frac{11}{30}} = \frac{30}{11} \text{ hours}
$$
$ \textbf{4. Conclusion:} $ It will take Alex, Ben, and Chris approximately 2.73 hours to complete the task together.
Work with Overtime and Variable Rates – Type 6
$ \textbf{Concept Explanation:} $ This type involves scenarios where an agent works at a different rate for different periods. This could include working faster initially and then slowing down or vice versa. The key is to split the work into segments based on the rate changes.
$ \textbf{Formulae:} $
$ \textbf{1. Work Done in Segments:} $
$$
\text{Work Done} = \text{Work Rate} \times \text{Time Worked}
$$
$ \textbf{2. Total Work:} $
$$
\text{Total Work} = \text{Sum of Work Done in All Segments}
$$
$ \textbf{3. Total Time:} $
$$
\text{Total Time} = \text{Sum of Time Worked in All Segments}
$$
Solved Problem – Type 6
$ \textbf{Example Problem:} $ David can complete a task in 6 hours if he works at a constant rate. However, he decides to work for the first 2 hours at 1.5 times his normal rate and then at his normal rate for the remaining time. How long does it take him to complete the task?
$ \textbf{Step-by-Step Solution:} $
$ \textbf{1. Determine David’s normal work rate:} $
$$
\text{David’s normal work rate} = \frac{1}{6} \text{ of the task per hour}
$$
$ \textbf{2. Calculate the work rate for the first 2 hours:} $
$$
\text{Work rate for the first 2 hours} = 1.5 \times \frac{1}{6} = \frac{1.5}{6} = \frac{1}{4} \text{ of the task per hour}
$$
$ \textbf{3. Calculate work done in the first 2 hours:} $
$$
\text{Work done in 2 hours} = \frac{1}{4} \times 2 = \frac{2}{4} = \frac{1}{2}
$$
$ \textbf{4. Determine the remaining work after 2 hours:} $
$$
\text{Remaining work} = 1 – \frac{1}{2} = \frac{1}{2}
$$
$ \textbf{5. Calculate the time to complete the remaining work at the normal rate:} $
$$
\text{Time to complete remaining work} = \frac{\text{Remaining work}}{\text{Normal work rate}} = \frac{\frac{1}{2}}{\frac{1}{6}} = \frac{1}{2} \times 6 = 3 \text{ hours}
$$
$ \textbf{6. Calculate total time taken:} $
$$
\text{Total Time} = 2 \text{ hours (first segment)} + 3 \text{ hours (second segment)} = 5 \text{ hours}
$$
$ \textbf{7. Conclusion:} $ It takes David a total of 5 hours to complete the task with the variable work rate.
Work and Time with Partial Completion – Type 7
$ \textbf{Concept Explanation:} $ In this type, an agent completes only a part of the work, and then another agent (or group of agents) finishes the rest. The task is to find the total time taken or the portion of work done by each.
$ \textbf{Formulae:} $
$ \textbf{1. Work Done by First Agent:} $
$$
\text{Work Done} = \text{Work Rate} \times \text{Time Worked}
$$
$ \textbf{2. Remaining Work:} $
$$
\text{Remaining Work} = \text{Total Work} – \text{Work Done by First Agent}
$$
$ \textbf{3. Time for Remaining Work:} $
$$
\text{Time} = \frac{\text{Remaining Work}}{\text{Work Rate of Second Agent}}
$$
Solved Problem – Type 7
$ \textbf{Example Problem:} $ Emma can complete a task in 8 hours. After working for 3 hours, she takes a break, and Jacob, who can complete the task in 6 hours, finishes the rest. How long does it take to complete the task?
$ \textbf{Step-by-Step Solution:} $
$ \textbf{1. Calculate Emma’s work rate:} $
$$
\text{Emma’s work rate} = \frac{1}{8} \text{ of the task per hour}
$$
$ \textbf{2. Calculate work done by Emma in 3 hours:} $
$$
\text{Work done by Emma in 3 hours} = \frac{1}{8} \times 3 = \frac{3}{8}
$$
$ \textbf{3. Determine the remaining work:} $
$$
\text{Remaining work} = 1 – \frac{3}{8} = \frac{5}{8}
$$
$ \textbf{4. Calculate Jacob’s work rate:} $
$$
\text{Jacob’s work rate} = \frac{1}{6} \text{ of the task per hour}
$$
$ \textbf{5. Calculate time for Jacob to complete the remaining work:} $
$$
\text{Time for Jacob} = \frac{\frac{5}{8}}{\frac{1}{6}} = \frac{5}{8} \times 6 = \frac{30}{8} = 3.75 \text{ hours}
$$
$ \textbf{6. Calculate total time taken:} $
$$
\text{Total Time} = 3 \text{ hours (Emma’s time)} + 3.75 \text{ hours (Jacob’s time)} = 6.75 \text{ hours}
$$
$ \textbf{7. Conclusion:} $ It takes a total of 6.75 hours to complete the task with Emma and Jacob working sequentially.
Work with Multiple Agents and Switching Roles – Type 8
$ \textbf{Concept Explanation:} $ This type involves scenarios where multiple agents work together for some time, then switch roles or one stops working, and the other continues. The challenge is to correctly calculate the time based on the change in roles.
$ \textbf{Formulae:} $
$ \textbf{1. Work Done by Both Together:} $
$$ \text{Work Done} = \text{Combined Work Rate} \times \text{Time Worked Together} $$
$ \textbf{2. Remaining Work After Switching:} $
$$ \text{Remaining Work} = \text{Total Work} – \text{Work Done Together} $$
$ \textbf{3. Time for One Agent to Complete Remaining Work:} $
$$ \text{Time} = \frac{\text{Remaining Work}}{\text{Work Rate of Single Agent}} $$
Solved Problem – Type 8
$ \textbf{Example Problem:} $ John and Paul can complete a task together in 4 hours. John works alone for the first 2 hours, then Paul joins him, and they finish the remaining work together in 3 more hours. How long would it take Paul to complete the task alone?
$ \textbf{Step-by-Step Solution:} $
$ \textbf{1. Calculate John and Paul’s combined work rate:} $
$$ \text{Combined work rate} = \frac{1}{4} \text{ of the task per hour} $$
$ \textbf{2. Calculate work done by John alone in 2 hours:} $
ย ย ย ย – Let John’s work rate be $ J $.
$$ \text{Work done by John} = J \times 2 $$
$ \textbf{3. Determine the remaining work after John’s 2 hours:} $
ย ย ย ย – Remaining work after John’s 2 hours is:
$$ \text{Remaining work} = 1 – 2J $$
$ \textbf{4. Calculate work done together by John and Paul in the next 3 hours:} $
ย ย ย ย – Let Paul’s work rate be $ P $.
$$ \text{Work done together} = (J + P) \times 3 $$
ย ย ย ย – Since they finished the task, the sum of work done should be 1:
$$ 2J + 3(J + P) = 1 $$
$$ 2J + 3J + 3P = 1 $$
$$ 5J + 3P = 1 $$
$ \textbf{5. Express John’s work rate in terms of Paul’s work rate:} $
ย ย ย ย – From the combined work rate:
$$ J + P = \frac{1}{4} $$
$$ J = \frac{1}{4} – P $$
$ \textbf{6. Substitute } J \textbf{ in the equation } 5J + 3P = 1: $
$$ 5 \left( \frac{1}{4} – P \right) + 3P = 1 $$
$$ \frac{5}{4} – 5P + 3P = 1 $$
$$ \frac{5}{4} – 2P = 1 $$
$$ -2P = 1 – \frac{5}{4} $$
$$ -2P = \frac{4}{4} – \frac{5}{4} = -\frac{1}{4} $$
$$ P = \frac{1}{8} $$
$ \textbf{7. Calculate Paul’s time to complete the task alone:} $
$$ \text{Paul’s work rate} = \frac{1}{8} $$
$$ \text{Time for Paul alone} = \frac{1}{P} = 8 \text{ hours} $$
Work Comparison with Different Groups – Type 9
$ \textbf{Concept Explanation:} $ This type involves comparing the work done by different groups of people or machines and determining how long it will take for a different configuration of people or machines to complete the same task. The key is to establish a baseline of work rate based on one group and use it to calculate the rate for another.
$ \textbf{Formulae:} $
$ \textbf{1. Work Rate of Group:} $ If a group of $ m $ men and $ w $ women can complete a task in $ D $ days, the work rate is:
$$
\text{Work Rate} = \frac{1 \text{ (task)}}{D \text{ days}}
$$
$ \textbf{2. Equivalent Work Rate:} $ If another group of $ m_1 $ men and $ w_1 $ women is to do the same work, use a proportionality constant (based on comparative efficiencies of men and women) to calculate the new work rate.
Work with Increase in Task Quantum – Type 10
$ \textbf{Concept Explanation:} $ This type deals with scenarios where the amount of work increases partway through the task. The key is to calculate the additional work based on the increase and determine the additional time needed.
$ \textbf{Formulae:} $
$ \textbf{1. Remaining Work:} $
$$
\text{Remaining Work} = \text{Total Work} – \text{Work Completed}
$$
$ \textbf{2. Increased Work Quantum:} $ If work increases by $ p\% $, the new total work is:
$$
\text{New Total Work} = \text{Original Work} \times \left( 1 + \frac{p}{100} \right)
$$
$ \textbf{3. Additional Time Needed:} $
$$
\text{Additional Time} = \frac{\text{New Remaining Work}}{\text{Work Rate}}
$$
Solved Problem – Type 10
$ \textbf{Problem:} $ A man completes $ \frac{7}{8} $ of a job in 21 days. How many more days will it take him to finish the job if the quantum of work is further increased by 50\%?
$ \textbf{Step-by-Step Solution:} $
$ \textbf{1. Determine the total time to complete the entire job:} $
Since the man completes $ \frac{7}{8} $ of the job in 21 days, we can calculate the total time required to complete the entire job.
$$ \text{Total time for the full job} = \frac{21 \text{ days}}{\frac{7}{8}} = 21 \times \frac{8}{7} = 21 \times \frac{8}{7} = 24 \text{ days} $$
$ \textbf{2. Calculate the work rate:} $
The man’s work rate can be determined by dividing the full job (considered as 1 unit of work) by the total time to complete it:
$$ \text{Work rate} = \frac{1 \text{ job}}{24 \text{ days}} = \frac{1}{24} \text{ jobs per day} $$
$ \textbf{3. Calculate the New Remaining Work After the Increase:} $
The man has already completed $ \frac{7}{8} $ of the original job, which is 0.875 of the original job.
The remaining work of the original job is:
$$ \text{Remaining work} = 1 – \frac{7}{8} = \frac{1}{8} $$
After increasing the total work by 50\%, the new remaining work will be:
$$ \text{New Remaining Work} = 1.5 – 0.875 = 0.625 \text{ (or } \frac{5}{8} \text{)} $$
$ \textbf{4. Calculate the Additional Time Required to Finish the New Remaining Work:} $
Using the work rate calculated earlier, the additional time required to complete the new remaining work is:
$$ \text{Additional time} = \frac{\text{New Remaining Work}}{\text{Work rate}} $$
$$ \text{Additional time} = \frac{\frac{5}{8}}{\frac{1}{24}} = \frac{5}{8} \times 24 = 15 \text{ days} $$
$ \textbf{5. Conclusion:} $
It will take the man an additional 15 days to finish the job after the quantum of work is increased by 50%.
Work Completion by Different Agents at Different Times – Type 11
$ \textbf{Concept Explanation:} $ This type involves agents working sequentially or switching roles after certain intervals. The objective is to determine the time taken by each agent individually or the total time required.
$ \textbf{Formulae:} $
$ \textbf{1. Work Rate of Agent:} $
$$ \text{Work Rate} = \frac{\text{Work Completed}}{\text{Time Taken}} $$
$ \textbf{2. Total Work Completion Time:} $
$$ \text{Total Time} = \text{Sum of Time Taken by Each Agent} $$
Solved Problem – Type 11
$ \textbf{Example Problem:} $ Ram and Shyam work on a job together for four days and complete 60% of it. Ram takes leave then, and Shyam works for eight more days to complete the job. How long would Ram take to complete the entire job alone?
$ \textbf{Step-by-Step Solution:} $
$ \textbf{1. Calculate combined work rate of Ram and Shyam:} $
ย ย ย ย – Let Ram’s work rate be $ R $ and Shyam’s work rate be $ S $.
$$ (R + S) \times 4 = 0.60 \text{ (job)} $$
$$ 4R + 4S = 0.60 $$
$$ R + S = 0.15 $$
$ \textbf{2. Calculate Shyam’s work rate:} $
ย ย ย ย – Shyam works alone for the remaining 8 days to complete the job:
$$ S \times 8 = 0.40 \text{ (job)} $$
$$ S = \frac{0.40}{8} = 0.05 $$
$ \textbf{3. Determine Ram’s work rate:} $
$$ R = 0.15 – 0.05 = 0.10 $$
$ \textbf{4. Calculate the time Ram would take to complete the job alone:} $
$$ \text{Time for Ram} = \frac{1}{R} = \frac{1}{0.10} = 10 \text{ days} $$
Work Completion Analysis with Different Work Portions – Type 12
$ \textbf{Concept Explanation:} $ In this type, each agent completes a different portion of the work. The problem is to determine who finishes the entire work first based on the completion rates of different portions.
$ \textbf{Formulae:} $
$ \textbf{1. Work Rate for Portion of Task:} $
$$ \text{Work Rate} = \frac{\text{Portion of Task Completed}}{\text{Time Taken}} $$
$ \textbf{2. Time for Full Task Based on Portion Completed:} $
$$ \text{Total Time} = \frac{\text{Full Task}}{\text{Work Rate}} $$
Solved Problem – Type 12
$ \textbf{Example Problem:} $ W can do 25% of a work in 30 days, X can do $ \frac{1}{4} $ of the work in 10 days, Y can do 40% of the work in 40 days, and Z can do $ \frac{1}{3} $ of the work in 13 days. Who will complete the work first?
$ \textbf{Step-by-Step Solution:} $
$ \textbf{1. Calculate full completion time for each agent:} $
ย ย ย – For W: 25% in 30 days means full work (100%) in:
$$ \text{Total Time} = \frac{\text{Full Task}}{\text{Work Rate}} = \frac{30}{0.25} = 120 \text{ days} $$
ย ย ย – For X: $ \frac{1}{4} $ in 10 days means full work in:
$$ \text{Total Time} = \frac{10}{0.25} = 40 \text{ days} $$
ย ย ย – For Y: 40% in 40 days means full work in:
$$ \text{Total Time} = \frac{40}{0.40} = 100 \text{ days} $$
ย ย ย – For Z: $ \frac{1}{3} $ in 13 days means full work in:
$$ \text{Total Time} = \frac{13}{\frac{1}{3}} = 13 \times 3 = 39 \text{ days} $$
$ \textbf{2. Determine who completes first:} $
ย ย ย – Z completes in 39 days.
$ \textbf{3. Conclusion:} $ Z will complete the work first.


